TECHNICAL SUPERVISION OF RUNWAY EXTENSION AND ASSOCIATED WORKS AT NORMAN MANLEY INTERNATIONAL AIRPORT IN KINGSTON, JAMAICA

Supervision of the design and works for the extension of the runway at Norman Manley Airport in Kingston - Jamaica, including the execution of sea fills and all the systems associated with the runway extension, with an investment of more than 50 million euros.

AIR INFRASTRUCTURE MANAGEMENT SERVICE OF THE HELIPORTS ASSIGNED TO THE GENERAL DIRECTORATE OF EMERGENCIES

Manager of Air Infrastructures of heliports assigned to the General Directorate of Emergencies in accordance with Law 21/2003, ensuring the continuity of use in safe conditions, compliance with safety conditions in design, use and operation of the facility, provision of emergency plans, establishment of procedures, control of operations, obstacle control...

MAINTENANCE MANAGEMENT AND CONTROL SERVICE AT THE AIRPORT OF LA PALMA

Management of La Palma Airport facilities to prevent, diagnose, correct and guarantee their correct operation and regulatory compliance. Verification of operation, supervision of maintenance companies, control and management of incidents through CMMS. Integrated control through SCADA system. Reporting to the final client AENA.

TECHNICAL ASSISTANCE TO SUPPORT THE PASSENGER EXPERIENCE CONTINUOUS IMPROVEMENT PLAN

Consultancy for the analysis, monitoring and improvement of the Airport Quality Plan developed to improve passenger experience satisfaction and coordination with the different Airport Stackholders.

TECHNICAL ASSISTANCE AIRCRAFT MOVEMENT SIMULATIONS AT VARIOUS AIRPORTS

Development of aircraft movement simulation on taxiways, taxiways and parking stands in the AENA Airport network (47 airports) using AviPLAN Airside simulation software and assessment of regulatory compliance. Study of the effects of engine jets at Adolfo Suarez Madrid-Barajas Airport.

TECHNICAL ASSISTANCE FOR THE DETERMINATION OF OBSTACLES IN AERONAUTICAL EASEMENTS AT TEN AIRPORTS AND MODIFICATION OF OBSTACLE STUDIES AT SEVERAL AIRPORTS

Complete Obstacle Study of 10 airports of the AENA network (among others, Alicante, Malaga, Tenerife Norte, Ibiza, ....) including data collection for the determination of coordinates, analysis and identification of obstacles in the Aeronautical Easements. Likewise, the modification of the Obstacle Studies of other airports is also carried out.

KING KHALID INTERNATIONAL AIRPORT APRON SIMULATION AND DESIGN

Design and simulation using Pathplanner simulation software of the parking stands (20 contact and 4 remote positions) of the aircraft apron of the King Khalid International Airport expansion in Riyadh. Developed for Louis Berger Engineering. Including training process in tool management with the client.

SMART PARKING SYSTEM IN COSTA RICA BY DATASYS

In-house project development and implementation of a technological solution for the control and monitoring of 300 parking spaces by means of parking space sensorization and APP management platform

SYSTEM FOR DETECTING AND PREDICTING THE PHENOMENON OF FRAGILITY IN THE HYDROGEN-FUELED NATURAL GAS TRANSMISSION NETWORK

R&D&I project for, aligned with the EU roadmap, the transition to hydrogen of Natural Gas transport networks. This project enables a combined NG/H2 management system, capable of detecting, in real time and continuously, the degree of H2 fragility of steel pipes used for NG transport and managing H2 transport and financed within the framework of the public agency Agencia Española de Innovación and in consortium with the UPV (Universidad Politécnica de Valencia).

TWY PAVEMENT REGENERATION AND ADAPTATION OF RWY AND TWY STRIP. ALICANTE AIRPORT

Detailed design for the regeneration of the pavement of the parallel taxiway and the fast exit lanes of Alicante Airport and the resolution of regulatory non-compliance for the Airport Certification with an investment of 11 million euros. Surface area 380,000 m2

REGENERATION OF RUNWAY 07L-25R BETWEEN E7 AND RUNWAY 02-20 BARCELONA-EL PRAT AIRPORT

Detailed design for the regeneration of the pavement of runway 06L-24R between TWY R6 and TWY R1 at Barcelona-El Prat Airport with an investment of 5 million euros. Surface area 70,000 m2

TECHNICAL PROJECT MANAGEMENT OF ELECTRIC VEHICLE CHARGING POINTS IN THE AENA AIRPORT NETWORK

Project Management, Technical Project Management and Supervision of the INVESTMENT of electric vehicle charging points at all Aena airports, from the beginning of their feasibility to their commissioning, at all Aena Airports
Since we started in 2010, our goal has been to provide customers with a comprehensive solution within the infrastructure sector. Today, having successfully completed more than 1,000 engineering projects in over 15 countries, we continue to eagerly embrace each new challenge. We are backed by a highly qualified team that is focused on continuous improvement and innovation, with the purpose of ensuring a satisfactory outcome in all our engineering projects: from projects in airports, urban works, or mobility, to technology and R&D projects, civil infrastructure, construction, infrastructure management, hydraulic and energy projects, and environmental projects.