PROJECT MANAGEMENT FOR THE DESIGN PHASE OF THE NEW PROCESSOR AND REMODELING OF T123

Project Management and Technical Direction of the T123 New Processor Building and Remodeling Project, estimated at 700 million euros, during the design development, bidding and transition period up to the construction works.

Description

Project Management and Technical Direction of the T123 New Processor Building and Remodeling Project, estimated at 600 million euros, during the design development, bidding and related transition period until construction.

Supervision of the design and drafting of the project in accordance with regulations, review and validation of all types of documents, reports, estimates and drawings, monitoring, supervision, testing, training and commissioning of the project, document management and supervision, preparation and review of quality assurance, meetings and control and management of design and engineering drawings.​

Magnitudes

Duration

Apr 23 – On Going

Surface

156.000 m²

Budget

Investment: €600 million Engineering: €1.45 million

Client

AENA (Spain)