DESIGN OF THE EXTENSION OF THE ACC BUILDING (AIR TRAFFIC CONTROL CENTER)

Expansion of ENAIRE buildings and critical facilities with a new pioneering controllers' room which contributes to the development of the management of 2 million flights per year and 2.2 million km2 of airspace. Investment: 15 million

Description

Expansion of ENAIRE's building and critical facilities with a new pioneering control room which contributes to the development of the management of 2 million flights per year and 2.2 million km2 of airspace.

The project consists of the expansion of the ACC building in Madrid to create a new control room and improve its operational infrastructure. It includes the construction of a 1,800 m² control room, with an open-plan design and high soundproofing, a 3,000 m² annex block for technical facilities and administrative areas, and an air-conditioned walkway connecting to the cafeteria. In addition, the ground floor of the existing building will be reorganized to incorporate meeting areas, offices and a representative lobby. The project will take into account sustainability criteria, current regulations and functionality, with a completion period of 24 months and an estimated cost of more than 17 million euros.

Magnitudes

Duration

Mar 21– Jun 22

Surface

12.842 m²

Budget

Investment: €17.1 million Engineering: €0.47 million

Client

ENAIRE (Spain)