DESIGN AND SUPERVISION OF THE ADAPTATION OF THE TERMINAL BUILDING AT REUS AIRPORT

Detailed design and supervision of the execution of the Expansion of the Reus Airport Terminal Building, Project and Works Management, with a duration of 4 years, and with an investment of nearly 14 million euros, applying the BIM methodology.

Description

Detailed design and supervision of the execution of the Reus Airport Terminal Building Expansion, project design and construction management. With a duration of 4 years, and with an investment of close to 14 million euros, applying the BIM methodology. The Modified Functional Design of the Reus Airport is being developed to update it to the new Schengen regulations, as well as to the modification of the existing traffic.

Magnitudes

Duration

Feb 17– Dic 20

Surface

18.550 m²

Budget

Investment: €15.7 million Engineering: €0.83 million

Client

AENA (Spain)