PROJECT MANAGEMENT FOR THE DESIGN PHASE OF THE TERMINAL AREA. TENERIFE SOUTH AIRPORT

Project Management and Technical Direction of the Project for the Remodeling of the Terminal of Tenerife South Airport for an amount of 310 Million Euros.

Description

Project Management and Technical Direction of the Project for the Terminal Remodeling of Tenerife South Airport for an amount of 310 million euros.

Supervision of the design and drafting of the project in accordance with regulations, review and validation of all types of documents, reports, estimates and drawings, monitoring, supervision, testing, training and commissioning of the project, document management and supervision, preparation and review of quality assurance, meetings and control and management of design and engineering drawings.​

Magnitudes

Duration

May 24 – On Going

Surface

78.000 m²

Budget

Investment: €310 million Engineering: €2.18 million

Client

AENA (Spain)

Contact