NEW AENA OFFICES IN MENORCA AIRPORT TERMINAL BUILDING

«Detailed design for the adequacy of an area located on the east side of the Terminal Building, on the P20 Departures floor to unify all Aena Departments in the Terminal Building, currently located in different buildings of the airport. This is an area of the Terminal Building, currently unused, including the terrace annexed to it, which will be enclosed by the construction of a floor slab and a walkable roof. The surface area of the project is 1,500 m2 and the budget for the execution of the works is 600,000 €.»

ADAPTATION OF THE AENA III BUILDING. PALMA DE MALLORCA AIRPORT

Detailed design for the adequacy of the old offices existing in this building to transform them into the new Civil Guard premises. At present, these offices (1,400 m2) are in disuse and in a poor condition that makes them practically unusable, so the work will require a complete interior replacement. The amount of the investment exceeds 1 million €.

SUPERVISION OF THE WORKS OF THE NEW TECHNOLOGY PARK OF FUERTEVENTURA

Supervision of the execution of the works “Urbanization of the General System of Insular Technological Infrastructure of the Fuerteventura Technology Park” and “Building of the Center for the Promotion of Knowledge and Technology Transfer of the Fuerteventura Technology Park” with a total investment of more than 20 Million of euros

CONSULTING TECHNICAL ASSISTANCE FOR THE MANAGEMENT OF DECENTRALIZED PROJECT AND WORK FILES PHASE III

Management of the decentralized investments of the airports of the AENA network (47 airports) during the period (2022-2025) for an estimated amount of 350 million €.

ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT WORK REQUEST MANAGEMENT SERVICE

Project Management for AENA (between 2016 and 2021) of the different actions carried out by external companies at Madrid Barajas Airport. Including technical feasibility study, project drafting, risk identification and monitoring and supervision of the actions. Investment of more than €100 M

COORDINATION SERVICE FOR PRIVATE WORKS IN COMMERCIAL AREAS OF T123 AT ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

Coordination and management of the different works carried out in the Commercial Areas of Terminals T1, T2 and T3 at Madrid Barajas Airport. Coordination of the areas involved, project review, management and monitoring of the works.

MAINTENANCE OF THE AERODROME MANUAL AND GRAPHIC UPDATE - PALMA DE MALLORCA AIRPORT

Technical service for the update of the Palma de Mallorca Aerodrome Manual as well as the obstacle control according to the revision plan established in the manual.

MONITORING AND TRACKING OF PASSENGER SATISFACTION WITH AIRPORT ORIENTATION

Consultancy for supervision, monitoring and quality indices in passenger satisfaction in the field of orientation at Adolfo Suárez Madrid-Barajas Airport

CONSULTANCY FOR THE ADAPTATION OF AIRPORT MAINTENANCE TO AESA REGULATIONS

«Consultancy service for the adaptation of airports to AESA regulations, performing the following activities:  Supervision of the airport manual related to the maintenance of the Movement Area and its associated procedures and records.  Updating of the Department of Maintenance Technical Support (DSTM) report tracking tools, pavement evaluations (PCI, PCN, Friction and Texture and Operability) and visual aids (Photometrics, Apron Lighting, In-flight Verification Reports).«

FEASIBILITY STUDY FOR THE IMPLEMENTATION OF A NEW HELIPORT IN “HOSPITAL DOCTOR JOSE MOLINA OROSA”, IN LANZAROTE. GOVERNMENT OF THE CANARY ISLANDS

Development of a feasibility study for the implementation of a new hospital heliport on the island of Lanzarote, including the procedure before the State Aviation Safety Agency and air compatibility studies

ENERGY AUDITS IN AENA AIRPORTS

Service for carrying out Energy Audits in the buildings and facilities of the twenty (20) largest Airports in the AENA network. Among them Madrid-Barajas, Barcelona, ​​Palma de Mallorca Alicante, Bilbao, Gran Canaria, Tenerife... for compliance with RD 56/2016

ADAPTATION OF THE AIRFIELD. CEUTA HELIPORT

Project design to solve the anomalies and damages that appeared in the pavement and support ground of the FATO, and on the other hand, to convert the three current parking positions for a total of five parking positions for simultaneous use for helicopters in the heliport of Ceuta. Investment of 4 million euros. Surface area 30,000 m2
Since we started in 2010, our goal has been to provide customers with a comprehensive solution within the infrastructure sector. Today, having successfully completed more than 1,000 engineering projects in over 15 countries, we continue to eagerly embrace each new challenge. We are backed by a highly qualified team that is focused on continuous improvement and innovation, with the purpose of ensuring a satisfactory outcome in all our engineering projects: from projects in airports, urban works, or mobility, to technology and R&D projects, civil infrastructure, construction, infrastructure management, hydraulic and energy projects, and environmental projects.