Engineering projects

Services

Markets

REMODELING OF THE EAST APRON OF THE SAN SEBASTIAN AIRPORT AIRCRAFT PARKING APRON.

Project design for pavement regeneration in the east apron of the aircraft parking apron, as well as the civil aviation sector of the San Sebastian airport. The action to be carried out is the regeneration of the pavement on the existing apron and the general aviation apron, the construction of a new taxiway to access the west apron and the adaptation of the drainage network, including the installation of a hydrocarbon separation plant. Investment of 6.8 million euros. Surface area 42,500 m2

NEW COMMERCIAL AREA IN TERMINAL BUILDING - MENORCA AIRPORT

Diseño de detalle de la Zona Comercial del Aeropuerto de Menorca en la planta P20 del Vestíbulo de Embarques del Edificio Terminal. El objetivo de las obras es adaptar los locales a las nuevas necesidades del aeropuerto, renovando su imagen, eliminando las barreras visuales, facilitando su uso por parte de los viajeros y adaptándolos a la nueva normativa de seguridad. Para ello, se ejecutará un bulevar o calle central hacia el que se realizará la apertura de las tiendas hacia la zona de vestíbulo, mediante el diseño interior y el cerramiento exterior de las mismas. Los nuevos locales presentarán mejoras estéticas y funcionales, además de adaptarse a la nueva normativa de seguridad. Inversión prevista: 600.000 €

REMODELING OF THE COMMERCIAL AREA AND PASSENGER ACCESS CONTROLS AT BILBAO AIRPORT.

Drafting of the project to adapt the commercial area to new uses and demands and unification of the security filters for passenger control. Planned investment: 500,000 €.

SUPERVISION OF THE NEW TECHNICAL-OPERATIONAL BUILDING AT ACC DE ENAIRE

Supervision of the construction works of the new Technical Operational Building at the ACC in Torrejón with a surface area of more than 9,100 m2 and an expected investment of 16.6 million Euros

MANAGEMENT OF THE WORKS FOR THE RENOVATION OF THE CANAL DE ISABEL II SUPPLY NETWORK. NORTHWEST LOT

Supervision of the works for the complete renovation of a 133-kilometer piping network of the water supply network using new techniques in the municipalities of the northern area of the Community of Madrid

AENA SMP MAINTENANCE CONTROL VISUAL AIDS

Supervision and control of the maintenance records of the Command and Presentation Systems (CPS) of the visual aids at Aena's airports and heliports.

STANDARDIZATION AND GRAPHIC GEOLOCATION OF THE ADOLFO SUAREZ MADRID-BARAJAS AIRPORT SAFETY SYSTEM INCIDENT DATABASE

Updating, standardization and geolocation in GIS of the database of incidents recorded in the Adolfo Suárez Madrid-Barajas Airport Security Operation System

SERVICE FOR THE DRAFTING OF THE INFORMATIVE STUDY FOR THE IMPROVEMENT OF THE M-316 ROAD BETWEEN CHINCHÓN AND VALDELAGUNA, AND REPORT ON THE ALLEGATIONS EVACUATED IN THE PUBLIC INFORMATION PROCESS

Informative Study and Environmental Impact Study for the improvement of the M-316 road, including the elaboration of Traffic Studies, noise study, archaeological study...). Elaboration of alternatives study. Reaction of the Environmental Impact Study

SERVICE FOR THE DRAFTING OF THE INFORMATIVE STUDY FOR THE ROAD DUPLICATION OF THE M-121 HIGHWAY. SECTION: A-2 (ALCALA DE HENARES-MECO) AND REPORT OF THE ALLEGATIONS EVALUATED IN THE PUBLIC INFORMATION PROCESS

Drafting of the Informative Study and Environmental Impact Study for the improvement of the M-121 road, including the elaboration of Traffic Studies, noise study, archaeological study...). Elaboration of alternatives study. Reaction of the Environmental Impact Study

NEW ROAD LINK IS-D. JOSEP TARRADELLAS AIRPORT BARCELONA-EL PRAT

Project design for new taxiway. The design includes the piping of a drainage channel, the installation of the aeronautical LED surface lighting system and the preloading of land for consolidation. Investment of 5.8 million euros. Surface area 20,500 m2

IMPROVEMENT OF APRON BEARING CAPACITY IN STANDS 1 - 7. REUS AIRPORT

Detailed design of the new apron in order to remedy the deficiencies of the detected pensintes, it also includes the sizing of a new drainage system that will channel under the apron a new main collector. The project also includes the design and sizing of the airport's new 400Hz system. Investment of 7 million euros. Surface area 48,000 m2

ENGINE TEST PLATFORM. SEVILLA AIRPORT

Diseño de detalle de nueva plataforma para la realización de pruebas de motores y lavado de aeronaves. El diseño incluye la incorporación de un sistema para el lavado de los aviones, diseño de configuración geométrica, nueva instalación eléctrica y de barreras para el chorro del motor con una inversión de 3 millones de euros. Superficie de actuación: 12.000 m2
Since we started in 2010, our goal has been to provide customers with a comprehensive solution within the infrastructure sector. Today, having successfully completed more than 1,000 engineering projects in over 15 countries, we continue to eagerly embrace each new challenge. We are backed by a highly qualified team that is focused on continuous improvement and innovation, with the purpose of ensuring a satisfactory outcome in all our engineering projects: from projects in airports, urban works, or mobility, to technology and R&D projects, civil infrastructure, construction, infrastructure management, hydraulic and energy projects, and environmental projects.