DEVELOPMENT OF AENA AIRPORT MAINTENANCE STRATEGIC PLAN

Strategic consulting to improve the efficiency of maintenance and asset management services. Including the following services. Digitalization, creation of scorecards and audits. Asset management; improvement of maintainability, life cycle optimization, replacement investment planning and improvement plan. Efficiency of economic management and knowledge management and continuous improvement. Define strategies and establish improvement processes. Audit plan; service compliance and asset condition

DRAFTING OF FEASIBILITY REPORTS FOR SEVERAL AIRPORTS IN THE AENA NETWORK.

Feasibility studies, aeronautical safety studies and associated action assessment reports for compliance with the regulatory requirements established by the State Aviation Safety Agency at different airports in the AENA network (Barcelona, Fuerteventura, San Sebastián, Asturias, La Palma, El Hierro).

DUE DILIGENCE FORTALEZA AND PORTO ALEGRE AIRPORTS (BRAZIL)

Development, together with Euroconsult engineering, of the Due Diligence for the Fortaleza and Porto Alegre Airports, including on-site evaluation of the existing infrastructure and initial investment appraisal (CAPEX).

TECHNICAL ASSISTANCE AIRCRAFT MOVEMENT SIMULATIONS AT VARIOUS AIRPORTS

Development of aircraft movement simulation on taxiways, taxiways and parking stands in the AENA Airport network (47 airports) using AviPLAN Airside simulation software and assessment of regulatory compliance. Study of the effects of engine jets at Adolfo Suarez Madrid-Barajas Airport.

TECHNICAL ASSISTANCE FOR THE DETERMINATION OF OBSTACLES IN AERONAUTICAL EASEMENTS AT TEN AIRPORTS AND MODIFICATION OF OBSTACLE STUDIES AT SEVERAL AIRPORTS

Complete Obstacle Study of 10 airports of the AENA network (among others, Alicante, Malaga, Tenerife Norte, Ibiza, ....) including data collection for the determination of coordinates, analysis and identification of obstacles in the Aeronautical Easements. Likewise, the modification of the Obstacle Studies of other airports is also carried out.

KING KHALID INTERNATIONAL AIRPORT APRON SIMULATION AND DESIGN

Design and simulation using Pathplanner simulation software of the parking stands (20 contact and 4 remote positions) of the aircraft apron of the King Khalid International Airport expansion in Riyadh. Developed for Louis Berger Engineering. Including training process in tool management with the client.

DOCUMENTATION FOR THE LEGALIZATION OF SEVEN EMERGENCY AND FIREFIGHTING HELIPORTS IN THE COMMUNITY OF MADRID

Development of Documentation for the Authorization Process before the Civil Aviation Authority for 7 heliports. Including aeronautical studies, administrative processing, environmental processing, air compatibility study and noise study.

MODIFICATION OF THE FUNCTIONAL DESIGN OF REUS AIRPORT

Within the framework of the design contract for the Expansion of the Reus Airport Terminal Building, the Modified Functional Design of Reus Airport was developed to update it to the new Schengen regulations as well as to the modification of the existing traffic.

AUTHORIZATION OF EVENTUAL INTAKE ZONES (VFR/IFR) FOR THE PUBLIC HEALTH EMERGENCY COMPANY

Development of Documentation for the Authorization Process before the State Agency of Aviation Safety for 20 heli-surfaces of the Public Company of Health Emergencies. Including feasibility study, administrative processing, environmental processing, air compatibility study and technical study of the same.

AIRFIELD AIRCRAFT MOVEMENT SIMULATIONS REPORT. ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

Aircraft movement simulation report on non-standard routes at Madrid-Barajas airport using AviPLAN software and economic assessment of actions to correct existing non-compliances

FEASIBILITY STUDY FOR THE IMPLEMENTATION OF A NEW HELIPORT IN “HOSPITAL DOCTOR JOSE MOLINA OROSA”, IN LANZAROTE. GOVERNMENT OF THE CANARY ISLANDS

Development of a feasibility study for the implementation of a new hospital heliport on the island of Lanzarote, including the procedure before the State Aviation Safety Agency and air compatibility studies

ENERGY AUDITS IN AENA AIRPORTS

Service for carrying out Energy Audits in the buildings and facilities of the twenty (20) largest Airports in the AENA network. Among them Madrid-Barajas, Barcelona, ​​Palma de Mallorca Alicante, Bilbao, Gran Canaria, Tenerife... for compliance with RD 56/2016
Since we started in 2010, our goal has been to provide customers with a comprehensive solution within the infrastructure sector. Today, having successfully completed more than 1,000 engineering projects in over 15 countries, we continue to eagerly embrace each new challenge. We are backed by a highly qualified team that is focused on continuous improvement and innovation, with the purpose of ensuring a satisfactory outcome in all our engineering projects: from projects in airports, urban works, or mobility, to technology and R&D projects, civil infrastructure, construction, infrastructure management, hydraulic and energy projects, and environmental projects.